Realized projects demonstrate practical experience in the preparation and implementation of complex infrastructure solutions across energy and industry, municipal utilities, urban infrastructure, and environmental, social and occupational health and safety matters.

Category

Energy and Energy Efficiency

USAID Securing Power, Advancing Resilience & Connectivity Activity (SPARC)

The USAID Securing Power, Advancing Resilience & Connectivity Activity (SPARC) supports the resilience, recovery and modernization of Ukraine’s energy sector. CDM Engineering Ukraine provides engineering and technical support covering thermal energy, renewable energy and power network projects, as well as procurement of critical electrical and district-heating equipment. The assignment combines project preparation with practical procurement and implementation support, from pre-feasibility and feasibility studies through technical specifications, bid evaluation and verification of delivered equipment.

Our services

  • Technical studies and recommendations
  • Pre-feasibility and feasibility studies for thermal, renewable energy and power network projects
  • Development and review of technical specifications for electrical and district-heating equipment
  • Procurement and tender support
  • Technical evaluation of bids
  • Responses to technical questions from suppliers
  • Equipment delivery witnessing and handover documentation
  • Post-delivery physical verification of assets

Municipal Energy Management Certification Ukraine (MEMCU)

The Municipal Energy Management Certification Ukraine (MEMCU) project supports Ukrainian cities in strengthening municipal energy management through the European Energy Award and implementation of demonstration investments. CDM Engineering Ukraine supports participating municipalities and prepares pre-feasibility studies for sustainable infrastructure projects across healthcare, water and wastewater, public lighting, education, sports facilities and heating systems. Proposed investments include renewable energy installations with battery storage, thermal modernization of public buildings, heat-pump systems and energy-efficient public lighting, with the overall objective of improving energy efficiency, resilience and energy independence of municipal infrastructure.

Our services

  • Municipal energy management support
  • Project implementation support
  • Procurement support, including evaluation and contracting
  • Pre-feasibility studies, including technical, financial, environmental and operational assessments.
  • Capacity building and support for European Energy Award implementation

Ukraine Energy Security Support Facility (ESSF)

The Ukraine Energy Security Support Facility supports investments aimed at strengthening Ukraine’s energy security and resilience. As part of the EBRD/EU credit-line facilities, CDM Engineering Ukraine provides local technical and engineering expertise for the assessment and development of eligible energy investments, including:

Our services

  • Technical Due Diligence and feasibility assessments of energy infrastructure and generation projects;
  • Assessment of CHP and distributed generation projects, including technical, financial, environmental and operational aspects;
  • Evaluation of renewable energy and energy storage solutions, including technical feasibility and investment requirements;
  • Technical assessment and development of energy efficiency and heating modernization projects, including review of design solutions, CAPEX/OPEX and implementation risks.

Technical Due Diligence for Solar PV Projects in Western and Central Ukraine

CDM Engineering Ukraine provided technical due diligence for a portfolio of 10 solar PV project sites in western and central Ukraine. The assignment assessed the suitability and technical readiness of the sites, including available design and survey documentation, site conditions, infrastructure, permitting and grid connection. CDM also reviewed the consistency of the proposed PV layouts with site constraints and applicable land-use requirements and evaluated compliance of the design documentation with technical grid-connection specifications.

Our services

  • Technical due diligence review
  • Site inspections and assessment
  • Review of design documentation
  • Review of topographical, hydrological and geotechnical information
  • Infrastructure and logistics assessment
  • PV layout and site-constraint review
  • Land-use and permitting review
  • Grid-connection assessment

Energy Efficiency in Municipalities – Zhytomyr

The project supports the energy-efficient modernization of selected schools and kindergartens in Zhytomyr, with the objective of significantly reducing municipal expenditure on energy supply while improving the performance of public buildings. CDM Engineering Ukraine provides local engineering and environmental support for project implementation, covering design, construction management and the management of environmental and social requirements.

Our services

  • Development of design documentation
  • Construction management
  • Environmental and social consulting
  • Environmental and Social Management Plan development (ESMP)
  • Stakeholder Engagement Plan development (SEP)
  • Environmental Impact Report (OVNS)

Engineering Consulting for Three Solar PV Parks – 147 MW

Three solar PV parks with a combined installed capacity of 147 MW were developed in Ukraine, with the plants planned to provide renewable electricity for approximately 76,000 households. CDM Engineering Ukraine supported Fichtner in providing engineering consulting services during the construction and completion phase of the projects.

Our services

  • Independent review of installation completion
  • Review of project completion against EPC requirements
  • Support for taking-over under the EPC contract

Technical Due Diligence for Libental 120 MW Wind Power Plant

The objective of this assignment is to provide the Lenders with a report on the technical aspects and risks of the Project in order to enable the Lenders to assess whether the Company will have the capacity to service the proposed loan.

Our services

  • Technical due diligence (TDD) review followed by the financial close and first disbursement support (visit the Project site to assess the overall suitability of the site to accommodate ongoing Project Operations: assessment of land use, terrain, soil, hydrology, topography, transportation access, grid connection, and environmental impacts like noise and shadow flicker. Review of relevant studies on ground conditions, transportation, flood risk, seismic hazards, climate constraints, interconnection infrastructure, and utilities, providing opinions on suitability, risks, and project impacts. The assessment includes participating in stakeholder meetings and analyzing site-specific factors to ensure proper planning for construction and operation. Review and opine on the status of construction and operation permitting and outline outstanding permits required for the construction and operation of the Project);
  • Monitoring during construction;
  • Monitoring during operation;
Category

Municipal Utilities

Engineering Consultancy Services for Diagnosis, Design, and Project Implementation Support to Enhance the Water Supply System in Kryvyi Rih, Ukraine

As part of its WASH program, IOM aims to support resilience and recovery efforts of water utilities (vodokanals) in Ukraine. The project in Kryvyi Rih aims to enhance access to a reliable and sustainable water supply service for the Kryvyi Rih population.

The project comprises five stages, starting with a comprehensive diagnosis of the water supply system and identification and prioritization of interventions focused on water treatment, pumping energy efficiency and water loss reduction. Conditional subsequent stages include detailed design and tender preparation, support for works supervision, and preparation for future interventions.

Our services

  • Comprehensive assessment of the Kryvyi Rih water supply system
  • Assessment of governance, finance, infrastructure, operational efficiency and resilience
  • Stakeholder consultations, field validation and KPI development
  • Identification and prioritization of intervention areas
  • Comparison of technical solutions and feasibility analysis
  • Preliminary design
  • Detailed design and tender preparation (conditional)
  • Hydraulic modelling, BoQs, ToRs and tender documents (conditional)
  • Support for works supervision, including quality control and progress monitoring (conditional)
  • Lessons learned and preparation for future interventions (conditional)

Remote Rapid Assessment: Power Needs of Ukraine’s Water and Sanitation Service Providers (WASHPaLS2)

The aim of the project was both to prevent urban water shortages and to assess longer-term improvements specific to energy efficiency that could be made by water utilities (Vodokanals) in five cities of Ukraine: Kyiv, Lviv, Kharkiv, Kherson and Odesa.

The rapid assessment was followed by procurement support, including identification of equipment specifications required for tender documents, market and vendor research, review of offers received from potential suppliers and presentation of assessment results.

Our services

  • Remote rapid assessment of water and sanitation service providers
  • Assessment of power needs
  • Assessment of longer-term energy-efficiency improvements
  • Identification of equipment specifications required for tender documents
  • Market and vendor research
  • Review of offers from potential suppliers
  • Presentation of assessment results

Rehabilitation of Water Infrastructure – Izium Vodokanal

The assignment covered engineering services for the rehabilitation of water infrastructure in Ukraine, specifically the wastewater pipeline of Izium Vodokanal.

CDM assessed a section of the pressure sewage network consisting of a double pipe with a diameter of 280 mm and a length of approximately 360 m, carried out the required surveys, developed design documentation for reconstruction and provided assistance in passing the design expertise.

Our services

  • Technical assessment of the pressure sewage network section
  • Topographical surveys
  • Geological surveys
  • Development of design documentation for reconstruction
  • Assistance in passing the design expertise

Programme Wastewater Treatment in Mykolaiv – Feasibility Study

Feasibility study for the construction of wastewater management system including reconstruction of pumping stations and sewer pipes and construction and/or rehabilitation of a wastewater treatment plant with an average treatment capacity of 80,000 m3/d. Development of scenarios for the future (war, peace, migration, etc) and technical possibilities such as new WWTP, rehabilitation of existing WWTP or a combination. Technical and financial feasibility assessment including preliminary designs and ‘no regret’ early action projects upstream the WWTP, Financial and Economic analysis, preparation of Priority Investment Programme, Investment Packages and Procurement Plans, Environmental and Social Assessment and development of ToR for ESIA.

Our services

  • The Feasibility Study is carried out in three Phases:
  • Phase 1: High-level overview of status and condition of the existing sewerage system and the existing WWTP. Development of planning scenarios.
  • Phase 2: Analysis of the planning scenarios and recommendations for how to develop and rehabilitate the wastewater system in Mykolaiv. Identification of smaller “early action” projects.
  • Phase 3: Conceptual, technical design of a new WWTP located in Mykolaiv City, with recommendations on capacity and wastewater treatment technology.

Technical Review of Municipal Enterprise “Voda Donbasu”

Municipal Enterprise “Voda Donbasu” is one of the largest utilities in Ukraine responsible for water and wastewater management in the Donetsk region. CDM carried out a technical review of the utility’s conditions, including analysis of water demand and supply, electricity usage and water quality.

An options study (pre-feasibility) was also undertaken, covering recommended changes to water conveyance and the network, asset decommissioning and replacement, renewable energy involvement and a preliminary implementation plan.

Our services

  • Analysis of water demand and supply
  • Assessment of electricity usage
  • Assessment of water quality
  • Options study / pre-feasibility study
  • Recommendations for water conveyance and network changes
  • Assessment of asset decommissioning and replacement
  • Assessment of renewable energy involvement
  • Preliminary implementation plan

Burshtyn Water Supply and Wastewater System Feasibility Study

The project included a detailed analysis of the water supply and wastewater disposal system in Burshtyn, Ivano-Frankivsk Region, and development of a feasibility study.

The objective of the project was to ensure that the water supply system would be sustainable for the Burshtyn area in the future. The feasibility study covered the entire water supply system, including wells, water treatment, water storage and the distribution system.

Our services

  • Detailed analysis of the water supply and wastewater disposal system
  • Development of a feasibility study
  • Assessment of wells
  • Assessment of water treatment
  • Assessment of water storage
  • Assessment of the water distribution system
Category

Urban Infrastructure

USAID Economic Resilience Activity (ERA)

The purpose of the USAID Economic Resilience Activity was to improve the overall economic resilience of eastern Ukraine. Starting in 2022, the project expanded its territorial coverage to central and western regions of Ukraine and adapted to provide crisis-related support, address urgent public infrastructure challenges, assist displaced persons and support public utility services.

CDM performed a full scope of engineering and environmental management services for the rehabilitation and improvement of existing public infrastructure, including local roads, bridges, water supply and sewerage networks, waste management infrastructure, public administration buildings, healthcare and education facilities.

Our services

  • Pre-feasibility studies and preliminary design
  • Design documentation and bills of quantity
  • Cost estimations
  • Procurement assistance
  • Construction management
  • Quality control
  • EHS management
  • The assignment also included technical assessments for routine restoration of more than 25 border crossing points on Ukraine's southwestern borders and 8 strategically important railway border crossing points.

Development of a Concept Master Plan under the Sustaining Health System Reform Program

The assignment provided technical assistance and analytical support to the Ministry of Health of Ukraine, with modernization of healthcare service delivery and the healthcare service delivery network forming one of the core elements of the program.

The work covered municipal healthcare facilities in Vinnytsia and included assessment of the physical condition of existing healthcare buildings and infrastructure to determine their suitability for renovation or extension and their expected service life. Illustrative concept designs were developed for new healthcare facilities based on functional and capacity requirements, incorporating energy efficiency and environmental sustainability considerations.

Our services

  • Assessment of municipal healthcare buildings and technology
  • Assessment of suitability for renovation and extension
  • Illustrative concept designs for new facilities
  • Incorporation of energy efficiency and environmental sustainability into facility designs
  • Cost estimation for reconstruction and new construction
  • Indicative capital investment cost estimation
  • Finalization of the technical report

Reconstruction of Social Infrastructure in Mykolaiv

The assignment covered reconstruction of social infrastructure in Mykolaiv Region. CDM’s work included validation of current and additional works for bomb shelters at Snihurivka, Shyroke, Sofiivka and Pavlivka, with particular focus on solar panels and the associated technical solutions.

The work also included technical assessment of buildings and foundations, validation of findings against Ukrainian standards, biddability and constructability audits, and procurement support for educational and social infrastructure facilities.

Our services

  • Review and validation of reconstruction works
  • Review of solar panel technical solutions
  • Technical assessment of buildings and foundations
  • Assessment of technical condition, structural integrity and deterioration
  • Validation against Ukrainian standards
  • Development of technical reports
  • Biddability and constructability audits
  • Preparation of tender documents

Special Assistance Program for the Modernization of Hospitals in Eastern Ukraine

The objective of the project was to improve the building infrastructure of state hospitals in Donetsk Region by identifying short-term measures for the renovation and modernization of hospital buildings, including building systems and energy efficiency improvements.

CDM provided engineering services covering the project from initial site assessment and development of rehabilitation concepts through detailed design, tender preparation and construction supervision. Rehabilitation concepts were developed in coordination with GIZ and local owners, including municipalities, regions and districts, and incorporated energy-efficiency solutions.

Our services

  • Site assessments
  • Development of framework work plans
  • Development of rehabilitation concepts
  • Energy-efficiency solutions
  • Initial cost estimates
  • Work schedules
  • Detailed design
  • Preparation of tender documents and scopes of services
  • Participation in contract award
  • Construction supervision
  • Quality assurance

EU Programme “Better Skills for Modern Ukraine” (EU4Skills)

Under the EU programme “Better Skills for Modern Ukraine” (EU4Skills), CDM supported the Ministry of Education and Science in the initial evaluation undertaken as part of the European Investment Bank’s due diligence for appraisal of a loan operation for 10 future Vocational Education and Training (VET) Centers of Excellence.

Our services

  • Inspection and evaluation of selected VET facilities
  • Development of conceptual designs
  • Definition of investment options
  • Assessment of investment costs
  • Preparation of Terms of Reference for the Project Implementation Unit

Technical Due Diligence (TDD) of power generation facilities in Khmelnytskyi Region, Ukraine

Technical consulting engineering services for the Technical Due Diligence (TDD) of the Customer’s power generation facilities in Khmelnytskyi Region, Ukraine. The assignment covered both the completed first-stage 851 kW gas-piston power generation unit and the second-stage development comprising a 4.6 MW gas-piston power unit and a 1.6 MW / 3.2 MWh Battery Energy Storage System (BESS). The assessment focused on the technical condition, design, equipment, infrastructure, implementation status and key risks associated with the facilities.

Our services

  • Assessment of the planned 4.6 MW gas-piston power generation unit;
  • Technical Due Diligence of the 1.6 MW / 3.2 MWh BESS;
  • Review of available design, engineering and technical documentation;
  • Assessment of major equipment, systems and supporting infrastructure;
  • Review of construction and implementation status of the facilities;
  • Assessment of grid connection and utility infrastructure, where applicable;
  • Identification and assessment of key technical and implementation risks;
  • Review of compliance with applicable technical and regulatory requirements;
  • Preparation of Technical Due Diligence Reports with findings, conclusions and recommendations.

Technical Due Diligence and Site Assessment for Potential Development Projects in Ukraine

Technical Due Diligence and preliminary site assessments were conducted for potential new development projects across Ukraine. The assignment focused on identifying key technical, infrastructure, environmental, regulatory and geotechnical constraints that could affect project feasibility and implementation.

Our services

  • Preparation of recommendations to support project feasibility and investment decisions.
  • Assessment of site accessibility, terrain and development constraints;
  • Evaluation of existing utilities and infrastructure capacity;
  • Identification of environmental and regulatory constraints;
  • Preliminary assessment of soil and geotechnical conditions;
  • Identification of key technical and development risks;
Category

Environment, Social & Occupational Health and Safety

Environmental and Social Impact Assessment of a Lithium Mining Project

The assignment comprised an Environmental and Social Impact Assessment (ESIA) of a lithium mining project in accordance with international best practice and International Finance Corporation (IFC) requirements, as well as an Environmental Impact Assessment (OVD) in accordance with Ukrainian legislation. The assessment covered the mine site and the associated waste disposal facility.

The work included site investigations, baseline studies covering environmental and socioeconomic conditions, sampling and laboratory testing, and preparation of environmental and social assessment and management documentation.

Our services

  • Site investigations and scoping finalization
  • Baseline investigations covering meteorology, air, noise, soil, groundwater and surface water
  • Biodiversity assessment
  • Socioeconomic and cultural heritage baseline studies
  • Water and soil sampling and laboratory testing
  • Preparation of the ESIA report
  • Environmental and Social Action Plan (ESAP)
  • Environmental and Social Management Plan (ESMP)
  • Environmental and Social Frameworks / Management Plans, as needed
  • Environmental Impact Assessment (OVD) under Ukrainian legislation

Environmental and Social Impact Assessment for Kyivpastrans

The assignment comprised an Environmental and Social Impact Assessment (ESIA) as part of the feasibility assessment of the Kyivpastrans project, in accordance with EBRD requirements.

The assessment included review of prior project preparation activities and the Environmental and Social Management System (ESMS), baseline studies of the project area, assessment of compliance with national and European Union environmental standards, and preparation of the principal environmental and social documentation required for the project.

Our services

  • Data collection and review
  • Site visit
  • Review of prior project preparation activities and ESMS
  • Assessment of environmental and social impacts, issues and risks
  • Environmental and social baseline study
  • Assessment of compliance with national and EU environmental standards
  • Preparation of the ESIA report
  • Environmental and Social Action Plan (ESAP)
  • Non-Technical Summary (NTS)
  • Stakeholder Engagement Plan (SEP)

Environmental and Social Impact Assessment – Olvia Sea Port Concession Project

The Olvia Sea Port Concession Project aimed to renew and upgrade the existing port facilities and develop a new grain terminal with a turnover capacity of 2 million tons in the Port of Olvia.

CDM carried out the Environmental and Social Impact Assessment (ESIA) for the project in line with EBRD Performance Requirements, IFC Performance Standards and Ukrainian regulations.

Our services

  • Environmental and Social Impact Assessment (ESIA)
  • Assessment against EBRD Performance Requirements
  • Assessment against IFC Performance Standards
  • Assessment against Ukrainian regulatory requirements

Biodiversity Study – Shymanivske Iron Ore Mine

The assignment comprised a Biodiversity Study of the Shymanivske Iron Ore Mine in Dnipropetrovsk Region, Ukraine, undertaken as part of the Environmental and Social Impact Assessment (ESIA) performed by ERM.

Our services

  • Biodiversity study
  • Support to the overall Environmental and Social Impact Assessment (ESIA)

Environmental Impact Assessment and Biodiversity Monitoring for Wind Farm Projects

The assignment covered environmental and biodiversity services for the development of two wind farm projects in Vinnytsia and Odesa regions.

CDM carried out monitoring of the annual cycle of birds and bats and an Environmental Impact Assessment (OVD) for the development of the two wind farm projects.

Our services

  • Annual-cycle bird monitoring
  • Annual-cycle bat monitoring
  • Environmental Impact Assessment (OVD)

Environmental and Social Impact Assessment of Compressor Stations

The assignment comprised an Environmental and Social Impact Assessment (ESIA) for the construction and modernization of several natural gas compressor stations.

The ESIA was performed in line with EIB Environmental and Social Standards. An Environmental Impact Assessment (OVD) was also carried out in accordance with the Ukrainian Law on Environmental Impact Assessment.

Our services

  • Environmental and Social Impact Assessment (ESIA)
  • Assessment in accordance with EIB Environmental and Social Standards
  • Environmental Impact Assessment (OVD)
  • Compliance with Ukrainian environmental legislation

Development, Implementation, and Management of Environmental and Safety Systems for M10 Industrial Park

The project focused on the development and implementation of comprehensive environmental, social, health and safety management systems for the M10 Industrial Park, supporting responsible construction and ensuring compliance with applicable environmental, social and safety requirements.

Our services

  • Development of Environmental and Social Management and Monitoring Plans;
  • Environmental, Social, Health and Safety monitoring;
  • Compliance monitoring and reporting;
  • Preparation of the Construction Completion Report.